Australian Antarctic Division logo
Australian Antarctic Division

 Mawson Station Water Making


Pipe Pipe Pipe Pipe
  Tank 1  

98%
full
  Tank 2  

98%
full
  Tank 3  

98%
full
Pipe
Pipe Pipe Pipe Pipe
Pipe Pipe Pump (running) Pipe
Station
Pipe Pipe
Pipe Pipe Pipe Pipe
Pipe
Diesel Boiler
Diesel boiler off
Off
61 °C
Boiler temperature
Boiler out Temp
Pipe valve
Pipe
Electric Boiler
Electric boiler off
Off
59 °C
Boiler temperature
Boiler in Temp
Melt bell pipes
Melt bell
Water Stored
264,600 litres
Potable Water Use
Jul: 14,830 litres
Jun: 106,420 litres
Melting ice

Page last updated Saturday, July 04, 2009 8:14:59 PM (AEST)

See also: Electrical | Heating | Davis ASP