Australian Antarctic Division logo
Australian Antarctic Division

 Mawson Station Water Making


Pipe Pipe Pipe Pipe
  Tank 1  

98%
full
  Tank 2  

98%
full
  Tank 3  

99%
full
Pipe
Pipe Pipe Pipe Pipe
Pipe Pipe Pump (running) Pipe
Station
Pipe Pipe
Pipe Pipe Pipe Pipe
Pipe
Diesel Boiler
Diesel boiler off
Off
69 °C
Boiler temperature
Boiler out Temp
Pipe valve
Pipe
Electric Boiler
Electric boiler off
Off
64 °C
Boiler temperature
Boiler in Temp
Melt bell pipes
Melt bell
Water Stored
265,500 litres
Potable Water Use
Nov: 56,830 litres
Oct: 77,650 litres
Melting ice

Page last updated Thursday, November 20, 2008 9:10:04 PM (AEST)

See also: Electrical | Heating | Davis ASP